Puget Sound Navel Base B.E.Q Parking Garage, Bremerton General Contractor: MARPAC Construction This project consists of 68,000 square feet of multi-level parking garage space. To return to the project completion page for the B.E.Q. Parking Garage, please click here.
With most of the lower section complete, the decking for the top post-tension slab is being formed up and the iron and cable put into position.
The first floor shoring is left in place to support the levels above until the top deck is poured. All materials are stored neatly out of the way until they are needed.
Construction of the first section of ramp is now completed. The jobsite is well
organized and running smoothly.
With the lower columns
poured, shoring for the second floor decking is put in place.
|
|
With the first floor retention walls in place, the excavators are busy moving the earth into position for the first series of ramps.
|