General Contractor: Pacific Heights Previous jobsite progress updates. More current jobsite progress updates can be seen by following this link. The pouring of the third floor post-tension slab. Click here to view an ANIMATION of this slab being poured.[photogallery/photo9389/real.htm]
Laying of the third floor decking and hardware.[photogallery/photo21970/real.htm]
Putting shoring in place for the third floor post-tension slab.[photogallery/photo22730/real.htm]
Working with the modular form system.[photogallery/photo4688/real.htm]
Stressing the steel tendons.[photogallery/photo27192/real.htm]
The pouring of the second level post-tension floor slab. [photogallery/photo20348/real.htm]
The placement of the tendons for the post-tension support system. [photogallery/photo18964/real.htm]
The laying of the decking for the post-tension slab. [photogallery/photo30098/real.htm]
The Preparing of scaffolding for the first level post-tension slab. [photogallery/photo11892/real.htm]
The Pouring of the first level floor slab. [photogallery/photo14080/real.htm]
The pouring of the Walls and elevator shaft. [photogallery/photo3200/real.htm]
The pouring of the footings and support pads. [photogallery/photo11870/real.htm]
A few different views of the initial job site. [photogallery/photo26187/real.htm]
|
|