Island Commons, Bainbridge Island

General Contractor: Pacific Heights

         Previous jobsite progress updates.

   More current jobsite progress updates can be seen by following this link.

The pouring of the third floor post-tension slab.

Click here to view an ANIMATION of this slab being poured.[photogallery/photo9389/real.htm]

 

Laying of the third floor decking and hardware.[photogallery/photo21970/real.htm]

 

Putting shoring in place for the third floor post-tension slab.[photogallery/photo22730/real.htm]

Working with the modular form system.[photogallery/photo4688/real.htm]

 

Stressing the steel tendons.[photogallery/photo27192/real.htm]

 

 

 

The pouring of the second level post-tension floor slab.

[photogallery/photo20348/real.htm]

 

The placement of the tendons for the post-tension support system.

[photogallery/photo18964/real.htm]

 

The laying of the decking for the post-tension slab.

[photogallery/photo30098/real.htm]

 

The Preparing of scaffolding for the first level post-tension slab.

[photogallery/photo11892/real.htm]

 

   The Pouring of the first level floor slab.

[photogallery/photo14080/real.htm]

 

The pouring of the Walls and elevator shaft.

[photogallery/photo3200/real.htm]

 

The pouring of the footings and support pads.

[photogallery/photo11870/real.htm]

 

A few different views of the initial job site.

[photogallery/photo26187/real.htm]