 Guadalupe, Tacoma

  General Contractor:  MC Lundgrin

   Excavation provided by: Dirtworks Northwest

   This project consists of footings and slab on grade with a single level of post-tension deck.

   In just three days over three quarters of the post-tension deck is in place.

   Backfilling along the perimeter walls has begun following the application of waterproofing.

   The slab was poured without a problem and now the Peri Skydeck and shoring is flying into place.

   All the wall forms have been stripped and preparations for the slab pour are in progress.

   The wall pour went well and all of the interior wall forms have been stripped.  Material is being brought in and all the excavation around the footings backfilled.

   With one day to the wall pour everything is in place and ready for concrete.  The columns were poured earlier in the week and the forms are being stripped and readied for more column placement.

   Despite heavy rain work has carried on quite well.  The majority of columns have been formed and are ready to pour, and well over half of the exterior walls and elevator core forms are complete.

   With the footings stripped work will begin on the walls soon.

   The first pour of the job is here and the weather cooperated nicely.

   The footings and pads are almost complete and should be ready for concrete shortly.

   Excavation continues while the footings and pads are starting to be formed.

   Gig Harbor Dirtworks is providing the excavation on the project.